Checked content

File:CPRR Summit Tunnel Central Shaft.jpg

Summary

The vertical central shaft of the CPRR "Summit Tunnel" (Tunnel #6) at Donner Summit which allowed drilling and excavation of the tunnel to be carried out on four faces at once during construction of the 1,659 foot tunnel over a period of 15 months in 1866-67.

Original digital photograph taken by the uploader ( Centpacrr) inside the Summit Tunnel in August, 2003.

Licensing

I, the copyright holder of this work, hereby publish it under the following licenses:
You may select the license of your choice.
The following pages on Schools Wikipedia link to this image (list may be incomplete):

Metadata

A background to Schools Wikipedia

Schools Wikipedia was created by children's charity SOS Children's Villages. SOS Childrens Villages is famous for the love and shelter it brings to lone children, but we also support families in the areas around our Children's Villages, helping those who need us the most. Sponsoring a child is the coolest way to help.